 | Description/Title | Published on Web (click to sort) |
  | 2007 Electricity Pricing Investigation - Statement of Reasons in Accordance with the 2007 Price Determination, January 2008 | 01/01/2008 |
  | 2007 Investigation - Service Incentive Paper | 21/05/2007 |
  | 2007 Reliability Review Issues Paper, October 2007 | 01/11/2007 |
  | 2008 Aurora Pay As You Go Price Comparison Report, Rates as at 1st July 2008 | 14/08/2008 |
  | 2008 Reliability Review Final Report, March 2009 | 01/03/2009 |
  | 2009 Aurora Pay As You Go Price Comparison Report, Rates as at 8 July 2009 | 10/07/2009 |
  | 2009 Aurora Pay As You Go Price Comparison Supplementary Report Concession Customers, August 2009 | 01/08/2009 |
  | 2009 Reliability Review Draft Report, November 2009 | 01/11/2009 |
  | Amendment of the Investigation into Electricity Supply Industry Pricing Policies Pricing Determination: Determination - Consultation Paper - December 2000 | 01/12/2000 |
  | APAYG Review - Final Report - October 2005 | 19/10/2005 |
  | Approach to calculating the distribution maximum allowable revenue - draft position | 20/12/2006 |
  | Approval of Distribution Loss Factors for Electricity Consumers 2007-08 | 30/03/2007 |
  | Aurora Pay As You Go, Issues Paper | 01/07/2004 |
  | Capacity Reserve Standards for the Tasmanian Power System - Determination | 01/08/2003 |
  | Capacity Reserve Standards for the Tasmanian Power System - November 2005 | 19/12/2005 |
  | CCP - Draft Recs to the Regulator, Distribution Powerline Vegetation Mgmt Code | 13/03/2007 |
  | Code Change Panel - Final Report and Recommendations | 01/03/2005 |
  | Code Change Panel Draft Recommendations to the Regulator September 2006 | 01/09/2006 |
  | Code Change Panel Final Recommendations regarding proposals to amend the Distribution Powerline Vegetation Management Code, Chapter 8A of the Tasmanian Electricity Code | 01/08/2007 |
  | Code Change Panel Issues Paper Proposed Changes to the Distribution Powerline Vegetation Management Code September 2006 | 01/09/2006 |
  | Code Change Panel Prepayment Meter Retail Code Issues Paper, January 2006 | 01/01/2006 |
  | Consultation Paper - Dissolution of RNPP and Revised Reliability Review Procedure - Nov 09 | 01/11/2009 |
  | Consultation Paper Draft Guideline for Dealing with Information Provided under Division 3 of Part 3 of the Electricity Supply Industry Act 1995 - September 2006 | 01/09/2006 |
  | Contestable Electricity Infrastructure Works - Discussion Paper | 01/07/2005 |
  | Costs and Benefits of the Rollout of Interval Meters in Tasmania - Final Report, October 2006 | 01/10/2006 |
  | Costs and Benefits of the Rollout of Interval Meters in Tasmania Draft Report August 2006 | 01/08/2006 |
  | Decision – Mid-Term Review of Aurora Energy Pty Ltd Capital Expenditure, 1 July 2002 to 30 June 2005 - September 2006 | 01/09/2006 |
  | Decision and Statement of Reasons - Aurora Energy Pty Ltd - NEM Entry Costs - February 2006 | 16/02/2006 |
  | Decision Making Framework for Metering Data Provider - Final Version | 14/03/2006 |
  | Declaration of Distribution Services to be Investigated and Draft Terms of Reference, Issues Paper - November 2006 | 01/11/2006 |
  | Declaration of Retail Services for the Regulation of Maximum Prices for Retail Tariffs & Terms of Reference for the Investigation - Issues Paper December 2006 | 01/12/2006 |
  | Distribution Loss Factor Calculations - Treatment of Non-Technical Losses | 14/03/2006 |
  | Distribution Loss Factors for Electricity Consumers for 2005-06 | 12/04/2005 |
  | Distribution Loss Factors for Electricity Consumers for 2006-07 | 27/04/2006 |
  | Distribution Network Performance Standards - Reliability Area Maps, North East Tasmania, November 2006 | 01/11/2006 |
  | Distribution Network Performance Standards - Reliability Area Maps, North West Tasmania, November 2006 | 01/11/2006 |
  | Distribution Network Performance Standards - Reliability Area Maps, South Tasmania, November 2006 | 01/11/2006 |
  | Distribution Network Performance Standards - Volume 1: Draft Report Summary of Proposals and Overview | 01/11/2006 |
  | Distribution Network Performance Standards - Volume 2: Appendices to the Draft Report | 01/11/2006 |
  | Distribution Network Reliability Standards - Volume 1: Final Report Summary of Proposals and Overview | 26/02/2007 |
  | Distribution Network Reliability Standards - Volume 2 : Appendices to the Final Report | 26/02/2007 |
  | Distribution Network Reliability Standards - Volume 3, Part 1: Reliability Areas - North West | 26/02/2007 |
  | Distribution Network Reliability Standards - Volume 3, Part 2: Reliability Areas - North East | 26/02/2007 |
  | Distribution Network Reliability Standards - Volume 3, Part 3: Reliability Areas - South | 26/02/2007 |
  | Distribution Powerline Vegetation Management Code of Practice - July 2002 | 01/07/2002 |
  | Draft Decision Fallback contract for tranche 4 customers with Appendix 1 | 01/07/2009 |
  | Draft Decision Mid-term Review of Aurora Energy Pty Ltd Capital Expenditure, 1 July 2002 to 30 June 2005 - July 2006 | 01/07/2006 |
  | Draft Guideline Consultation Policy & Procedure of the Tasmanian Energy Regulator September 2006 | 01/09/2006 |
  | Draft Report and Proposed Maximum Prices for Electricity Distribution Services and Retail Tariffs on Mainland Tasmania | 31/07/2007 |
  | Draft Report Public Benefit Assessment for Electricity Retail Competition in Tasmania Draft Report, May 2008 | 01/05/2008 |
  | ECCC - Newsletter March 2007 | 02/03/2007 |
  | ECCC Newsletter - November 2006 | 23/11/2006 |
  | Electricity Distribution and Retail Accounting Ring fencing Guidelines No. 2.2, Issue No.4 - July 2008 | 01/07/2008 |
  | Electricity Licence Application Form Version 1.2 - January 2008 | 01/01/2008 |
  | Electricity Licence Application Form Version 2 Oct 2009 | 01/10/2009 |
  | Electricity Price Investigation - Terms of Reference - April 1998 | 01/04/1998 |
  | Electricity Pricing - 2006 Tariff Approval - Statement of Reasons | 01/12/2005 |
  | Electricity Pricing - 2007 Determination for Distribution - Form of Regulation paper | 01/12/2005 |
  | Electricity Pricing - Determination of maximum prices for electricity retailing to tariff customers on mainland Tasmania | 08/12/2006 |
  | Electricity Pricing - Determination of maximum prices for electricity retailing to tariff customers on Mainland Tasmania - Statement of reasons | 08/12/2006 |
  | Electricity Pricing - Draft Determination of Retail Tariffs on Mainland Tasmania for 2007 | 01/11/2006 |
  | Electricity Pricing - Information Paper for 2007 Determination of Retail Tariffs on Mainland Tasmania | 03/11/2006 |
  | Electricity Supply Industry Performance and Information Reporting Guideline, March 2009 | 01/03/2009 |
  | Electricity Supply Industry Performance Brochure 2001-2002 - July 2003 | 01/07/2003 |
  | Electricity Supply Industry Performance Reporting Guideline, Issues Raised In Submissions and The Regulators Response | 01/03/2007 |
  | Electricity Supply Industry (Electricity Prices) Order 2002 - October 2002 | 01/10/2002 |
  | Electricity Transmission Accounting Ringfencing Guideline, Electricity Industry Guideline No. 2.1, Issue No. 2 | 01/07/2004 |
  | Energy Pricing for Non-Contestable Customers Review of Independent Experts Methodology and Process | 01/05/2007 |
  | Extension of Controls for Electricity Pricing to 31 December 2003 - Issues Paper - October 2002 | 01/10/2002 |
  | Final Decision - Approval of Pro-forma Fallback Contract Proposed by Aurora Energy Pty Ltd | 21/12/2006 |
  | Final Decision Fallback contract for tranche 4 customers with Appendix 1 | 01/08/2009 |
  | Final Report and Maximum Prices for Distribution and Retail Services on Mainland Tasmania | 28/09/2007 |
  | Final Revised Statement of Findings 29 July 08 | 01/07/2008 |
  | Final statement of reasons - GSL exemption for windstorm of 22 Jan 2009 with BoM report attached | 17/08/2009 |
  | Framework for the 2002-03 Investigation into the Maximum Prices of Electricity Distribution Services and Retail Tariffs on Mainland Tasmania - December 2002 | 01/12/2002 |
  | Frequency Operating Standards for the Tasmanian power system | 01/11/2004 |
  | Frequency Operating Standards for the Tasmanian Power System - Decision - February 2006 | 16/02/2006 |
  | Frequency Operating Standards for the Tasmanian Power System - Determination | 01/08/2003 |
  | GST Implications for the Electricity Supply Industry in Tasmania Occasional Paper - June 2000 | 01/06/2000 |
  | Guarantee Service Level - Principles | 01/10/2003 |
  | Guaranteed Service Level Scheme Guideline - December 2007 | 13/12/2007 |
  | Guideline dealing with information provided under Division 3 of Part 3 of the Electricity Supply Industry Act 1995 | 21/11/2006 |
  | Guideline for a Tasmanian Annual Planning Statement Version 2.1 December 2008 | 01/12/2008 |
  | Guideline for Ringfencing in the Tasmanian Electricity Supply Industry | 01/10/2004 |
  | Guideline on a Tasmanian Annual Planning Statement - December 2005 | 22/12/2005 |
  | Guideline on Incident Reporting for the Tasmanian Electricity Supply Industry (Version 2, November 2006) | 13/11/2006 |
  | Guidelines for Power System Directions by the System Controller, Determination | 01/10/2003 |
  | Guideline, Approval of Network Tariffs in accordance with the 2007 Determination | 01/11/2007 |
  | Guideline, Approval of Retail Tariffs in accordance with the 2007 Determination - November 2007 | 01/11/2007 |
  | Improvements to Performance Reporting Ascertaining Baseline Performance - June 2003 | 01/06/2003 |
  | Information for Licence Applicants Guideline, Version: Issue No. 5, 20 Feb 07 | 20/02/2007 |
  | Investigation into Electricity Supply Industry Pricing Polices - May 1999 | 01/05/1999 |
  | Investigation into Electricity Supply Industry Pricing Policies - Declared Electrical Services Pricing Determination | 01/11/2003 |
  | Investigation into Electricity Supply Industry Pricing Policies Declared Electrical Services Pricing Determination - 31 October 2007, Reissued December 2007 | 01/12/2007 |
  | Investigation into Electricity Supply Industry Pricing Policies Pricing Determination - December 1999 | 01/12/1999 |
  | Investigation into Electricity Supply Industry Pricing Policies, Draft Report - September 1999 | 01/09/1999 |
  | Investigation into Electricity Supply Industry Pricing Policies, Final Report - November 1999 | 01/11/1999 |
  | Investigation into Electricity Supply Industry Pricing Policies, Pricing Determination, First Issued December 1999, Amended 2000 | 01/12/1999 |
  | Investigation into Hydro-Electric Corporation Pricing Policies, Issues Paper - April 1998 | 01/04/1998 |
  | Investigation into Hydro-Electric Corporation Pricing Policies, Terms of Reference - April 1998 | 01/04/1998 |
  | Investigation into the Pricing Policies of the Electricity Supply Industry 2002-03: Declaration of Services to be Investigated, Issues Paper - June 2002 | 01/06/2002 |
  | Investigation of Prices for Electricity Distribtution Services On Mainland Tasmania: 2007 - Declaration of Distribution Services to be Investigated & Terms of Reference for the Price Investigation - Issue Paper November 2006 | 01/12/2006 |
  | Investigation of Prices for Electricity Distribution Services and Retail Tariffs on Mainland Tasmania Final Report and Proposed Maximum Prices | 01/09/2003 |
  | Investigation of Prices for Electricity Distribution Services and Retail Tariffs, Draft Report, June 2003 (Consolidated Report) | 01/06/2003 |
  | Issues Paper - Aurora Energy Pty Ltd - NEM Entry Costs - November 2005 | 28/11/2005 |
  | June 2005 - Electricity Supply Outage to Comalco and Zinifex on 25 June 2005 due to Trip of Gordon Generator No 1 | 11/11/2005 |
  | Network Project Assessment Regulatory Test Guideline - May 2003 - withdrawn November 2005 | 01/05/2003 |
  | Newsletter Edition 2 - April 2005 | 01/04/2005 |
  | Newsletter Edition 3 - June 2005 | 30/06/2005 |
  | Notice of Intention to declare retail services for Non - Contestable Tariff Customers for the Purpose of the Regulation of Maximum Retail Prices and Draft Terms of Reference Consultation Paper, September 2009 | 22/09/2009 |
  | Office of the Tasmanian Energy Regulator - Electricity Supply Industry Performance and Information Reporting Guideline - Version 1.0 - February 2007 | 08/03/2007 |
  | Office of the Tasmanian Energy Regulator, Investigation of Prices for Electricity Distribution Services and Retail Tariffs on Mainland Tasmania, Supplementary Final Report on Special | 20/06/2008 |
  | Office of the Tasmanian Energy Regulator, Structure of licence fees position paper version 1.2, Issued March 2007 | 01/03/2007 |
  | Overview of Draft Report and Proposed Maximum Prices for Electricity Distribution Services and Retail Tariffs on Mainland Tasmania | 31/07/2007 |
  | Overview of Final Report and Proposed Maximum Prices for Electricity Distribution | 28/09/2007 |
  | Pay as You Go Price Comparison for December 2006 | 20/12/2006 |
  | Policy on the Treatment of Confidential Submissions | 01/09/2006 |
  | Price Control of Electrical Services: Reasons for Declaration of Certain Services and Proposal to Revoke Declaration of Certain Services - November 2002 | 01/11/2002 |
  | Regulator's Report - Lindisfarne substation Outage, 1 February 2005 | 27/05/2005 |
  | Regulator's Report - Norwood - Scottsdale - Derby transmission line outage, 3 February 2005 | 27/05/2005 |
  | Regulator's Report Feb05 Storms | 03/06/2005 |
  | Reliability and Network Planning Panel - determination on Requirements for Automatic Interruptible Load | 01/04/2005 |
  | Reliability and Network Planning Panel - 2005 Reliability Review Draft Report - February 2006 | 23/02/2006 |
  | Reliability and Network Planning Panel - The 2002 Reliability Review Report - March 2003 | 01/03/2003 |
  | Reliability and Network Planning Panel - The 2003 Reliability Review Report | 01/01/2004 |
  | Reliability and Network Planning Panel - The 2004 Reliability Review Report | 03/05/2005 |
  | Reliability and Network Planning Panel - The 2006 Reliability Review Report - March 2007 | 09/05/2007 |
  | Reliability and Network Planning Panel - The 2007 Reliability Review Report - April 2008 | 01/04/2008 |
  | Reliability and Network Planning Panel (RNPP) - 2005 Reliability Review Issues Paper - November 2005 | 01/12/2005 |
  | Reliability and Network Planning Panel (RNPP) - 2005 Reliability Review Report - May 2006 | 17/05/2006 |
  | Renewable Energy Certificate Scheme - Facts Sheet - October 2002 | 01/10/2002 |
  | Renewable Energy Certificate Scheme - Research Paper (Amended) - November 2002 | 01/11/2002 |
  | Research Paper: Electricity Distribution Pricing Aggregate Annual Revenue Requirement (AARR) - December 2002 | 01/12/2002 |
  | Review of Aurora Energy Pty Ltd's Aurora Pay As You Go - Final Report, November 2009 | 01/11/2009 |
  | Review of Aurora Energy Pty Ltd's, Aurora Pay As You Go, Draft Report, September 2009 | 18/09/2009 |
  | Review of Distribution Powerline Vegetation Management Code - November 2005 | 01/12/2005 |
  | Review of the use of the System Controller's power to issue directions - Gordon Power Station outage | 01/09/2003 |
  | September 2005 - The Regulator's Report - Supply Outage to Burnie, Hampshire, Emu Bay, Port Latta and Smithton - 10 September 2005 | 10/11/2005 |
  | Statement of Findings concerning electromagnetic interference and complaint handling under the Code March 2008 | 01/03/2008 |
  | Statement of Reasons - Hydro Tasmania - Energy Production Capability | 18/08/2005 |
  | Statement of Reasons 2009 - 10 Retail Tariffs and Network Tariffs | 19/06/2009 |
  | Statement of Reasons Aurora Late Payment Fees and Direct Debit Disc 050304 | 01/03/2005 |
  | Statement of Reasons for Distribution Declaration | 25/01/2007 |
  | Statement of Reasons for Retail Declaration | 25/01/2007 |
  | Statement of Reasons for the Guideline on Incident Reporting for the Tasmanian Electricity Supply Industry (May 2005) | 23/06/2005 |
  | Status Report: Aurora Energy's Actions in response to the Distribution Powerline Vegetation Management Code Review - May 2006 | 16/05/2006 |
  | Structure of Licence Fees Electricity Supply Industry, March 2009 | 01/03/2009 |
  | Structure of Licence Fees, March 2005 | 01/04/2005 |
  | Structure of Participant Fees, Position Paper - May 2002 | 01/05/2002 |
  | Supplementary Draft Report on Special Services Provided by Aurora Energy, April 2008 | 01/04/2008 |
  | Tas Energy Supply Industry Performance Report (NOTE this is a ZIP file containing all Chapters and will take extra time to download) | 01/12/2004 |
  | Tasmanian Electricity Supply Industry Performance Report - 2000-2001 | 01/12/2001 |
  | Tasmanian Electricity Supply Industry Performance Report - Summary | 01/12/2003 |
  | Tasmanian Electricity Supply Industry Performance Report 2001-02 Volume 1 - December 2002 | 01/12/2002 |
  | Tasmanian Electricity Supply Industry Performance Report 2001-02 Volume 2 - December 2002 | 01/12/2002 |
  | Tasmanian Electricity Supply Industry Performance Report 2002-03 - Volume 1 | 01/12/2003 |
  | Tasmanian Electricity Supply Industry Performance Report 2002-03 - Volume 2 | 01/12/2003 |
  | Tasmanian Energy Supply Industry Performance Report 2005-06 | 15/12/2006 |
  | Tasmanian Energy Supply Industry Performance Report 2006-07 | 01/12/2007 |
  | TEC - Previous Code that ceases to have effect on the commencement of the Electricity - National Scheme (Tasmania) Act 1999 | 01/09/2002 |
  | TEC (May 2005 version) in full | 26/05/2005 |
  | Terms of Reference for 2007 Investigations into maximum electricity prices | 25/01/2007 |
  | The Regulator's Report - George Town - Comalco 220 kV Transmission Line Outage - 3 February 2005 | 17/06/2005 |
  | The Regulator's Report - Major Power System Outage in Southern Tasmania 28 January 2005 | 16/05/2005 |
  | The Regulator's Report - Supply Outage to the Northern Region - 19 February 2005 | 19/08/2005 |
  | Transmission Network Security and Planning Criteria Consultation Paper - November 2005 | 18/11/2005 |
  | Transmission Network Security and Planning Criteria, RNPP, Final Report, July 2006 | 01/08/2006 |
  | Typical Electricity Customers - Preferred Methodology | 01/04/2006 |